Project Overview

CJ Paint Spraying was appointed by Riverside Building Supplies Ltd to refurbish approximately 880m² of asbestos-cement roofing at its busy premises in Heybridge, Maldon. Years of exposure to the coastal climate had left the roof weathered and increasingly porous, with biological growth and localised vulnerabilities around junctions and fixings.

Rather than undertake a disruptive and costly roof replacement, the project centred around retaining and protecting the existing asbestos-cement sheets. CJ developed a controlled refurbishment programme combining specialist cleaning, remedial repairs and a three-stage encapsulation system. The aim was to create a sealed, weather-resistant surface while locking down asbestos fibres and extending the serviceable life of the existing roof.

Project Details

Sector:
Commercial / Building Supplies

Service:
Asbestos-Cement Roof Refurbishment & Encapsulation

Scope:
Approximately 880m² of asbestos-cement roofing

Client: Riverside Building Supplies Ltd

 

What the Customer Wanted

Maintaining ageing industrial infrastructure requires a delicate balance between structural restoration and stringent health and safety compliance. CJ Paint Spraying was recently appointed by Riverside Building Supplies Ltd to undertake the comprehensive refurbishment of approximately 880 m² of asbestos-cement roofing at their busy premises in Heybridge, Maldon. This project represents a critical intervention designed to extend the lifespan of the building’s envelope while ensuring the long-term safety of the site.

The primary objective for Riverside Building Supplies was to address a weathered and deteriorating asbestos-cement roof that had become a liability due to its age and the nature of the material. Over years of exposure to the Essex coastal climate, the roof sheets had become porous, accumulated significant biological growth, and developed minor structural vulnerabilities at the junctions and fixings.

The customer sought a solution that would avoid the massive capital expenditure and operational upheaval of a full roof replacement. Stripping an asbestos roof in a live commercial environment is a complex, high-risk undertaking that often requires significant downtime. Instead, the client required a safe, cost-effective encapsulation system. This system needed to provide a total seal against the elements, preventing water ingress and, most importantly, locking down the asbestos fibres to prevent environmental contamination.

Furthermore, the customer demanded a long-term performance guarantee. By appointing CJ Paint Spraying, they were able to secure a high-performance finish backed by a robust 25-year warranty. This provided the business with total peace of mind, knowing that their roof would remain maintenance-free and fully compliant with asbestos management regulations for decades to come.

Project Preparation

Success in asbestos-cement refurbishment is dictated by the rigour of the preparation phase. Because asbestos-cement is classified as a fragile substrate, CJ Paint Spraying implemented a “zero-contact” walking policy. Meticulous planning was required to ensure that no operative stood or knelt directly on the roof sheets or rooflights at any time.

The preparation phase began with the establishment of secured roof ladders and crawling boards, designed to distribute weight across the structural purlins. We installed full edge protection and defined strict exclusion zones to protect both our team and the client’s staff. A critical component of the preparation was the environmental protection strategy; all gutters, downpipes, and drains were sealed to prevent any contaminated cleaning water or debris from entering the site’s drainage system.

In accordance with HSE guidelines, the roof was cleaned using controlled wet methods. We strictly prohibited dry brushing or high-pressure jet washing, which can aerosolise hazardous fibres. Instead, a specialised low-pressure soft wash was used to remove moss, lichen, and decades of accumulated debris. All resulting slurry and waste were meticulously contained, labelled, and removed from the Heybridge site via an approved hazardous waste route, supported by full consignment documentation.

Once the substrate was decontaminated, a detailed structural inspection was performed. Our technicians replaced damaged fixings where safe to do so and removed failed sealants using low-disturbance hand tools. We then sealed minor cracks and vulnerable junctions with compatible high-performance roofing compounds to create a uniform surface.

The final stage of preparation involved a series of “hold-point” inspections. Before any coating was applied, the site supervisor verified the ambient temperature, substrate dryness, and dew point to ensure optimal conditions for adhesion. The specialist encapsulation system was then applied in a three-stage process: a dedicated bonding primer, a main encapsulation coat, and a protective finishing coat. Throughout the application, Wet Film Thickness (WFT) checks were recorded to ensure a consistent, durable barrier. Upon completion, Riverside Building Supplies was presented with a comprehensive handover package, providing a traceable record of the encapsulation for their asbestos register and activating the 25-year warranty.

See the Transformation

Services Delivered

Asbestos-Cement Roof Encapsulation

Moss, Lichen & Contamination Removal

Controlled Asbestos Waste Management

Crack & Vulnerable Junction Sealing

Protective Finishing Coat

Customer-Focused

The Result

The completed refurbishment provided Riverside Building Supplies with a sealed and protected asbestos-cement roof without the significant cost and operational disruption associated with stripping and replacing approximately 880m² of existing roofing. The encapsulation system created a durable barrier against weathering and water ingress while securing the asbestos fibres within the existing substrate.

Detailed application monitoring and recorded Wet Film Thickness checks provided a traceable record of the completed works for the site's asbestos register. The finished system is also supported by a 25-year warranty, giving the client a long-term solution for protecting and extending the life of the existing roof.