CASE STUDY

Off-Site Intumescent Fire Protection to Structural Steelwork

Project Overview

CJ Paint Spraying provides specialist off-site intumescent fire protection for structural steelwork, applying carefully specified coating systems designed to achieve the required fire resistance performance for individual construction projects.

This project involved a structured process of technical planning, steelwork inspection, surface preparation and controlled intumescent coating application. Particular attention was given to the different steel profiles, required coating thicknesses and compatibility of the existing primer system, ensuring that the application process followed the approved fire protection specification.

By carrying out the works in a managed off-site environment, CJ Paint Spraying was able to carefully coordinate each stage of the process, from initial preparation through to final inspection and handling. The approach focused on achieving consistent coating coverage, maintaining quality control and preparing the completed steelwork for safe transportation and subsequent installation on site.

Project Details

Service:
Off-Site Intumescent Fire Protection

Scope:
Inspection, preparation, intumescent coating application, thickness testing and final quality assurance of structural steelwork

Location: Off-site coating facility

Coating System: Specified intumescent system, including Nullifire SC802 where required

Fire Resistance: As specified by the project requirements

 

What the Customer Wanted

The project required a reliable and carefully controlled method of applying intumescent fire protection to structural steelwork before its delivery and installation on site. The coating system needed to meet the specified fire resistance requirements, with application thicknesses determined by the individual steel profiles, section factors and relevant design temperatures.

An important part of the requirement was ensuring that the coating was applied consistently across the different steel sections, including beams, columns, flanges, webs and exposed edges. The existing primer system also needed to be assessed for compatibility with the selected intumescent coating, with any surface defects or areas requiring remedial preparation addressed before application.

The customer also required a documented quality assurance process, including dry film thickness measurements and visual inspections, to demonstrate that the completed works complied with the approved coating specification.

Completing the works off-site allowed the steelwork to undergo the necessary preparation, coating, inspection and curing stages in a managed environment before being carefully handled and prepared for transportation to the construction site.

Project Preparation

Before commencing the coating works, CJ Paint Spraying undertook a detailed review of the project specification, structural drawings and supporting technical documentation. This established the steel profiles, surface areas and required fire resistance period, allowing the appropriate intumescent coating requirements to be determined.

The required dry film thickness (DFT) was established in accordance with the approved fire protection system, taking account of the relevant steel section factors and design temperatures. This planning stage ensured that the correct materials, application equipment and procedures were available before the steelwork entered the coating process.

Each steel section was then inspected to assess the condition of the substrate and existing primer. Surfaces were checked for dust, grease, oil, moisture and other contaminants that could affect coating adhesion or performance. Where necessary, suitable cleaning and remedial preparation were undertaken to provide a sound surface for the subsequent coating application.

Particular attention was given to identifying damaged or defective primer areas and confirming compatibility between the existing primer and the specified intumescent system. Any required remedial treatment was carried out in accordance with the approved specification and manufacturer's recommendations.

Intumescent Coating Application

Once the steelwork had been inspected and prepared, the specified intumescent coating was applied using suitable specialist application equipment.

Where required by the project specification, Nullifire SC802 water-based intumescent coating was used in accordance with the approved coating system and manufacturer's technical guidance.

The coating was applied in controlled stages to achieve the required dry film thickness for the designated fire resistance period. Application conditions, drying intervals and curing requirements were carefully monitored throughout the process to maintain coating integrity and a consistent standard of finish.

Care was taken to ensure even coverage across all accessible steel surfaces requiring protection, including flanges, webs, edges and other areas where accurate coating application was particularly important.

Quality Assurance and Final Inspection

Quality assurance formed an important part of the application process. Regular visual inspections and dry film thickness measurements were undertaken using suitable calibrated equipment, with readings recorded in accordance with the project requirements.

The coated steelwork was inspected for uneven application, insufficient coverage, runs, sagging and mechanical damage. Any areas requiring remedial attention were identified and corrected in accordance with the manufacturer's recommendations and applicable inspection criteria.

Following application, the steelwork was allowed to dry and cure under suitable environmental conditions. Careful handling and storage procedures helped minimise the risk of damage, particularly around exposed edges and contact points during lifting and movement.

Where required by the specification, a compatible protective topcoat was applied once the intumescent coating had reached the appropriate condition for overcoating.

A final inspection was then completed to assess coating coverage, overall finish and condition. Relevant quality documentation, including recorded dry film thickness readings, was collated before the steelwork was prepared for collection or delivery to site.

See the Transformation

Services Delivered

Steelwork Handling & Preparation for Transport

The Result

The off-site coating process provided a carefully managed approach to applying intumescent fire protection to structural steelwork, with each stage undertaken in accordance with the approved project specification and relevant manufacturer's recommendations.

Through detailed preparation, controlled coating application and documented quality assurance, the process was designed to achieve the specified coating thicknesses and consistent coverage required for the designated fire resistance performance.

Completing the works off-site also allowed the steelwork to be inspected, coated, cured and handled in a controlled environment before being prepared for delivery to site, helping to support efficient project coordination and minimise the need for subsequent on-site coating work.

The project demonstrates CJ Paint Spraying's specialist approach to off-site structural steel fire protection, combining technical planning, careful application and comprehensive quality control to deliver coating works in line with the requirements of modern construction projects.