CASE STUDY

Industrial Roof Refurbishment: Asbestos Cement Roof Encapsulation for a Midlands Food Production Facility

Project Overview

CJ Paint Spraying was appointed to refurbish approximately 10,900m² of ageing asbestos cement roofing across three large warehouse buildings at a food production facility in the Midlands. The roofs were affected by moss and lichen growth, surface contamination, localised damage and persistent water ingress.

With food production continuing throughout the project, removing and replacing the existing asbestos roofing would have created significant disruption and contamination risks. Instead, CJ developed a low-disturbance refurbishment programme that combined controlled cleaning, remedial repairs and a high-performance encapsulation coating system. This allowed the existing roofs to be made watertight and protected for the longer term while maintaining the strict safety requirements of a live food production environment.

Project Details

Sector:
Food Production / Industrial

Service:
Asbestos Cement Roof Refurbishment & Encapsulation

Scope:
Approximately 10,900m² of asbestos cement roofing across three warehouse buildings

Client: Food Production Facility

 

What the Customer Wanted

The client faced a significant challenge common to many industrial estates: an aging roof structure that was beginning to fail but was too costly and disruptive to replace entirely. The existing asbestos cement sheets were suffering from significant moss and lichen growth, surface contamination, and localised damage, which had led to persistent water ingress issues.

The primary objective was to extend the service life of the roof sheeting while improving weather protection across the 10,900m² area. However, because the facility remained fully operational for food production, a traditional “strip and replace” method was out of the question. Such a process would have introduced unacceptable risks of dust contamination and significant operational downtime.

Instead, the customer sought a cost-effective, long-term refurbishment solution that would encapsulate the existing asbestos, seal all leaks, and provide a uniform, aesthetically pleasing finish. They required a methodology that prioritised safety—particularly regarding the fragile nature of asbestos cement—and a contractor capable of providing comprehensive Quality Assurance (QA) records and a robust warranty to protect their investment for years to come.

Project Preparation

Success on a project of this magnitude, especially within a live food production environment, is entirely dependent on meticulous preparation and a specialised methodology. CJ Paint Spraying implemented a “low-disturbance” strategy, ensuring that at no point were the asbestos cement sheets cut, drilled, or sanded, thereby preventing the release of hazardous fibres.

The preparation phase began with the installation of comprehensive safety and access infrastructure. Full perimeter scaffold edge protection was erected to provide collective fall protection, and Haki stair towers were utilised to ensure safe and efficient access for all operatives. To mitigate the risks associated with fragile roofing, a strict “no direct walking” policy was enforced; all staff worked from controlled access routes and staging systems designed to distribute weight safely. Furthermore, a cherry picker was deployed to lift materials directly to the roof level, reducing manual handling and further protecting the roof’s integrity.

A critical component of the preparation was the management of biological growth and debris. Using a low-pressure soft wash treatment, our team removed moss and lichen without damaging the underlying substrate. Recognising the environmental and health risks, we treated all cleaning waste as hazardous. Every fragment of moss and debris was contained, lowered safely from the roof, and disposed of via a registered asbestos-waste carrier, with full consignment documentation provided to the client.

Once the surface was decontaminated and dry, the remedial preparation commenced. This included the sealing of all laps, fixings, and cracks. In areas of more significant damage, bonded GRP translucent panels were installed to restore structural and weatherproofing integrity.

The final stage of the process involved the application of a high-performance, water-based elastomeric roof coating. This low-VOC system was specifically selected for its compatibility with fibre cement and its ability to provide a flexible, waterproof seal. Applied in two coats to achieve a minimum dry film thickness of 275 microns, the system was monitored through a rigorous QA process. This included batch tracking, weather monitoring, and wet film thickness checks, all backed by a comprehensive photographic record. The result was a fully encapsulated, watertight roof system that delivered the protection the customer required without the need for a costly replacement.

See the Transformation

Services Delivered

Asbestos Cement Roof Refurbishment

Controlled Asbestos Waste Disposal

Installation of Bonded GRP Translucent Panels

High-Performance Elastomeric Roof Coating

Two-Coat Encapsulation System

Customer-Focused

The Result

The completed works delivered a fully encapsulated and watertight roof system across approximately 10,900m², addressing the existing water ingress while protecting and extending the service life of the asbestos cement roofing. The two-coat elastomeric system achieved a minimum dry film thickness of 275 microns, with application quality monitored and recorded throughout the project.

Crucially, the refurbishment was achieved without stripping the existing asbestos roof. This avoided the disruption and contamination risks associated with replacement and allowed the food production facility to remain operational while providing the client with a long-term solution backed by comprehensive QA records.