CASE STUDY
60-Minute Intumescent Coating in Dover
Project Overview
CJ Paint Spraying was commissioned to deliver a high-specification fire protection system for the structural steelwork of a major new multi-storey development in Dover. The project required the complete steel frame to achieve a certified 60-minute fire resistance rating, helping maintain structural stability in the event of a fire.
The project used Nullifire SC802, a water-based intumescent coating applied to precise thickness requirements for the different beams, columns and steel sections throughout the development. Alongside the coating application, extensive wet and dry film thickness monitoring was undertaken to provide the traceable quality assurance and certification required for the building's fire safety documentation and final handover.
Project Details
Sector:
Construction / Multi-Storey Development
Service:
Intumescent Coating of Structural Steelwork
Scope:
Application and certification of a 60-minute fire protection system across structural columns, beams and associated steelwork
Fire rating: 60 minutes
What the Customer Wanted
CJ Paint Spraying was recently commissioned to deliver a high-specification fire protection solution for a major new multi-storey development in Dover. The project focused on the application of a fully documented intumescent coating system to the building’s structural steelwork, a critical component in ensuring the life safety and structural integrity of the facility.
The primary objective for the client was to achieve a certified 60-minute fire resistance rating for the entire structural steel frame. In modern multi-storey construction, fire protection is not merely a preference but a stringent regulatory requirement. The customer needed to ensure that in the event of a fire, the structural columns, beams, and associated steel sections would remain stable for at least one hour, providing vital time for evacuation and emergency service intervention.
To meet these rigorous standards, the project specification called for the use of Nullifire SC802, a high-performance, water-based intumescent coating. The client required more than just the application of the product; they demanded a service that included comprehensive quality assurance (QA) and traceable certification. This documentation is essential for the building’s fire safety files and final handover. The challenge was to apply this coating to precise thicknesses across a complex variety of steel sections, each with different fire-loading requirements, while maintaining a smooth and professional finish suitable for a high-calibre development.
Project Preparation
The success of a fire-protection project is determined long before the final coat is applied. At the Dover site, CJ Paint Spraying implemented a meticulous preparation and monitoring protocol to ensure the Nullifire SC802 system performed exactly as designed.
The process began with a thorough inspection of the structural steelwork, which arrived on-site with a factory-applied primer. Our team identified any areas where the primer had been damaged during transit or installation, performing localised surface preparation and applying compatible primer repairs to ensure a sound foundation. Following this, the surrounding surfaces were extensively masked and protected to prevent overspray within the live construction environment.
The technical core of our preparation involved a detailed review of the project’s intumescent loading schedule. This schedule determines the exact thickness required for each individual steel member based on its size, type, section factor, and the number of exposed faces. Using specialist airless spray equipment, our trained operatives began the application process.
Crucially, preparation and quality control continued during the application itself through Wet Film Thickness (WFT) monitoring. By taking regular WFT readings while the coating was wet, our team could confirm that the correct volume of material was being deposited evenly across all faces of the steel. This proactive approach allowed for immediate corrections, ensuring the coating was built up to the necessary levels before curing.
Once the Nullifire SC802 had sufficiently cured, the final phase of verification began. Using calibrated electronic testing equipment, we conducted exhaustive Dry Film Thickness (DFT) inspections. Every beam and column was tested, with readings recorded against the specific steel member’s location. Any areas found to be below the required specification were immediately marked for additional coats and subsequent re-inspection.
The result was a robust, fully compliant fire protection system. Upon completion, the client was provided with a comprehensive certification package, including WFT and DFT records, batch numbers, and environmental condition reports. This traceable record provides the customer with total peace of mind, demonstrating that the structural heart of their Dover development is protected to the highest possible standards.
Services Delivered
60-Minute Intumescent Coating
Structural Steel Fire Protection
Wet Film Thickness (WFT) Monitoring
Dry Film Thickness (DFT) Testing
Remedial Coating Where Required
Customer-Focused
The Result
The completed works provided the structural steel frame with the specified 60-minute fire resistance, with coating thickness individually verified across the different steel members to ensure the system met the project requirements. Any areas identified below specification during testing were recoated and reinspected before completion.
CJ Paint Spraying also provided a comprehensive certification package containing WFT and DFT records, product batch numbers and environmental condition reports. This gave the client a fully traceable record demonstrating that the intumescent system had been applied and verified to the required specification, ready for inclusion within the building's fire safety files and final handover documentation.
Planning a similar project?
Speak to our Team Today.